Emergency workPennsylvania rules
Pennsylvania lets you give up the three-day right to cancel emergency repairs only by signing a 4-by-6-inch card after a written estimate
The card is the one way the state's consumer protection law lets a homeowner waive the wait, and only when the homeowner called the contractor about an emergency at the house.
- Price
- $25or more for the goods or services
- Card
- 4 by 6inches at least, preprinted
- Type
- 10-ptboldface at least
- Given up
- 3business days to cancel
A homeowner in Pennsylvania who signs a home improvement contract normally has three business days to cancel it. Section 7 of the state's Unfair Trade Practices and Consumer Protection Law allows one way to give that right up: an emergency work authorization, signed when the homeowner has called the contractor about a bona fide emergency at the house. The law, as amended in 2004, requires a written estimate of the total cost first, and the authorization has to be a preprinted card at least 4 by 6 inches with its wording in 10-point boldface type.
7(j.1)The card applies only when all three conditions hold, starting at $25
Section 7(j.1) sets three conditions, and all three must hold. The price of the goods or services is $25 or more. The homeowner contacted the contractor, so a contractor who knocks on the door after a storm cannot use the card. The work is needed to remedy a bona fide emergency on the homeowner's residential property.
A door-to-door contractor after a storm fails the second test, whatever the price or the damage
- PriceGoods or services of $25 or more7(j.1)(1)(i)
- Who starts itThe buyer contacts the seller7(j.1)(1)(ii)
- Kind of problemA bona fide emergency on the buyer's residential property7(j.1)(1)(iii) and 7(n)
Source: UTPCPL section 7, paraphrasedChecked October 19, 2026
Section 7(n) defines a bona fide emergency as a condition that makes the house uninhabitable or could make it so. The law names conditions that significantly affect the heating, electrical, plumbing or ventilation system, the roof or the outer walls, and says the list is not complete.
The law names six parts of a house where a condition can make it uninhabitable
- Ventilation
- Roof
- Outer walls
- Plumbing
- Electrical
- Heating
Ink: the systems and parts the law names. Gray: the rest of the house. Source: UTPCPL section 7(n)Checked October 19, 2026
The Home Improvement Consumer Protection Act, the 2008 law that governs most remodeling contracts, leaves emergency work under section 7 out of its definition of a home improvement, and its section 7(b) excepts the same work from the three-day right. The Attorney General's office says in its answers on the act that this exception covers only emergencies that meet the section 7 criteria, and that the contractor has to get the emergency waiver in each case.
7(j.1)(3)One printed line on the card gives up the three-day right
The statute prints the card's wording. It names the date of the transaction and the seller, and it authorizes the seller to start the goods or services needed to remedy the emergency. The homeowner agrees to pay in full for the work provided. The line that gives up the right reads:
"You agree not to exercise the rights afforded you by the Unfair Trade Practices and Consumer Protection Law to cancel the contract within three business days from the above date."
Card wording, section 7(j.1)(3)(ii)
The homeowner then confirms that the attached estimate accurately describes the work, and dates and signs the card.
Section 7(j.2) adds three rules about money. The written estimate has to state the total cost, including any service call fee, and has to come before the work. If the work done costs more than the estimate, the contractor needs a further written authorization from the homeowner for the added work. A contractor may charge a service call fee for diagnosing the problem even if no repair follows, but has to tell the homeowner right away whether a fee applies.
7(o)Shutting off the gas, water or power needs no card
A contractor answering an emergency call may take immediate preliminary steps without the card. Section 7(o) limits those to steps needed to remove a clear and immediate danger of death or serious bodily injury, such as shutting off gas, oil, sewage, water or electric service. Any other repair work is outside that definition. The contractor may charge for those first steps without a written authorization.
Shutoffs the law gives as examples need no card, and any repair after them does
Source: UTPCPL section 7(o), paraphrasedChecked October 19, 2026
ExampleThe $800 found behind the wall needs its own signature
This example uses round numbers and is not drawn from any real job. On a January night a pipe bursts in the basement of a Conshohocken twin and water is running across the floor. The homeowner calls a plumber, who says on the phone that the service call fee is $200.
The plumber arrives and shuts off the water main. That is an immediate preliminary step, so no card is needed yet. Before repairing anything, the plumber writes an estimate of $1,500 for the whole job, including the $200 fee. The homeowner signs the card with the estimate attached, and the work starts at once.
Each increase over the estimate needs a new signature
Dollars the homeowner has authorized in writing at each step of an emergency pipe repair
Example with round numbers. The $200 service call fee is part of the $1,500 estimate. Gray rule: the written estimate. Yellow: added work. Source: UTPCPL section 7(j.2)Data (CSV)
Behind the wall the plumber finds a second split section that adds $800. Under section 7(j.2) the plumber has to stop and get the homeowner's written authorization for the added work before doing it. The final bill of $2,300 should match the estimate plus the signed addition.
By the final bill the homeowner should hold the card, the estimate and the added authorization
| Step | What happens | Amount | Paper the homeowner should have |
|---|---|---|---|
| 1. The call | Homeowner calls a plumber about a burst pipe; the plumber says on the call that a service call fee applies | $200 | Note of the fee and the time of the call |
| 2. Shutoff | Plumber shuts off the water main to stop the flooding | No card needed | None for this step |
| 3. Estimate | Plumber writes an estimate for the total cost including the service call fee | $1,500 | Written estimate |
| 4. Card | Homeowner signs the emergency work authorization card with the estimate attached | $1,500 | Signed 4-by-6-inch card and estimate |
| 5. Added work | Plumber finds a second split pipe behind the wall | $800 more | New written authorization signed by the homeowner |
| 6. Final bill | Total for the repair | $2,300 | Card; estimate; added authorization; invoice |
Example with round numbers, not drawn from any real job. Source: UTPCPL section 7Data (CSV)
The repair may also need a permit. Under 34 Pa. Code § 403.62(b), part of the Uniform Construction Code, an emergency repair or replacement of equipment can go ahead without a permit if the application reaches the building code official within 3 business days. Our guide to permits and inspections in Conshohocken lists the local offices.
16 CFR 429The federal rule asks for a handwritten statement in place of a printed card
The Federal Trade Commission's cooling-off rule, 16 CFR Part 429, also gives a three-day right to cancel many sales made at the buyer's home, and it has its own emergency exception. It too requires that the buyer started the contact. In place of a printed card, the buyer gives the seller a separate statement, dated, signed and written in the buyer's own hand, that describes the emergency and waives the right to cancel. The rule's section 429.2 says the commission does not mean to preempt every state law that grants a right to cancel. How the two forms fit together on one job could not be verified from these sources.
Both rules require the buyer to start the contact and set the floor at $25
PennsylvaniaUTPCPL section 7
- Who must start the contact
- The buyer
- What counts
- A condition that makes or could make the home uninhabitable
- Form of the waiver
- Preprinted card at least 4 by 6 inches in 10-point boldface
- Price threshold
- $25 or more
FederalFTC rule, 16 CFR 429
- Who must start the contact
- The buyer
- What counts
- A bona fide immediate personal emergency of the buyer
- Form of the waiver
- Separate dated and signed statement in the buyer's own handwriting
- Price threshold
- $25 or more at the buyer's home
Before you signAsk for the fee on the phone and read the total before work starts
- Ask about the service call fee on the phone, and write down the amount and the time of the call.
- Before anyone starts the repair, ask for the written estimate and read the total.
- Check that the card is a printed form, that it carries the seller's name and today's date, and that the estimate is attached.
- Keep a photo of both.
If the job grows, sign for the added amount only after you see it in writing. A card signed for a burst pipe covers the work needed to fix that emergency. For a larger remodel that follows, such as new drywall and flooring in the basement, expect a regular contract with the three-day notice, the deposit cap and the other terms in our guide to what Pennsylvania law requires when you hire a contractor. The three-day right to cancel explains the notice. Roof leaks have their own article on Conshy Roofers.
Section 7What the law requires, from the $25 threshold to the service call fee
| Requirement | What the law says | Section |
|---|---|---|
| Who starts it | The buyer contacts the seller | UTPCPL 7(j.1)(1)(ii) |
| Price | Goods or services of $25 or more | UTPCPL 7(j.1)(1)(i) |
| Kind of problem | A bona fide emergency on the buyer's residential property | UTPCPL 7(j.1)(1)(iii) and 7(n) |
| Estimate first | Written estimate of the total cost including any service call fee before work starts | UTPCPL 7(j.2) |
| Card size | Preprinted card at least 4 by 6 inches | UTPCPL 7(j.1)(3)(i) |
| Type | At least 10-point boldface | UTPCPL 7(j.1)(3)(ii) |
| Card wording | Date of transaction; seller's name; authorization to proceed; agreement to pay; waiver of the three-day right; buyer's statement that the attached estimate is accurate | UTPCPL 7(j.1)(3)(ii) |
| Signature | Buyer signs and dates the card | UTPCPL 7(j.1)(3)(ii) |
| Cost goes over estimate | Seller must get further written authorization for the added work | UTPCPL 7(j.2) |
| Service call fee | Allowed whether or not more work follows; seller must say at once whether one applies | UTPCPL 7(j.2) |
Paraphrased from the text posted by the General Assembly on October 19, 2026. Source: UTPCPL section 7Data (CSV)
Caveats
This is general information about the statutes, not legal advice for a particular job. Whether a condition counts as a bona fide emergency turns on the facts. If a contractor used the card for work that was not an emergency, or billed past the estimate without a new signature, ask a lawyer or the Attorney General's Bureau of Consumer Protection.
A note in the posted statute says the 2004 amendments apply to contracts signed on or after the amendment took effect. The texts described here are those posted by the General Assembly, the Pennsylvania Code and the eCFR on October 19, 2026.